🎉 £80M Government Funding Available for School Solar | Holiday-Only Installation | 200+ Schools Powered

Solar Panel Installation for Bristol Schools

Serving 285+ schools across Bristol and South West England with holiday-only installation, full curriculum integration, and government funding support. 34 successful installations and counting.

MCS Certified
DBS Checked Teams
Holiday-Only Installation
£80M Gov Funding
School Solar Hotline
0800 SCHOOL SOL
Open Now
Mon-Fri 8am-6pm
34
Bristol Schools Powered
£19,800
Average Annual Savings
1541
Annual Sunshine Hours
285+
Schools in Bristol

Bristol Education Solar Landscape

Bristol City Council oversees 285+ educational institutions across Bristol, serving over 92,600 pupils. Following Bristol Carbon Neutral by 2030, there's unprecedented support for renewable energy projects across the region's schools.

Schools throughout Bath, Weston-super-Mare, Clevedon, Portishead, Yate, Thornbury are experiencing energy cost increases of up to 300% since 2021. Our Bristol-specific solar solutions are helping schools combat these rising costs while delivering exceptional educational benefits across BS postcodes.

Bristol's strategic location with excellent transport links via M4 motorway, M5 corridor, M32 city link, Bristol Temple Meadsenables our installation teams to serve all schools efficiently. The region's 1541annual sunshine hours provide optimal conditions for solar energy generation.

Why Bristol Schools Choose Solar

  • Excellent solar irradiance levels in South West England
  • Bristol City Council climate support
  • Comprehensive curriculum integration
  • Strategic transport access via M4 motorway

Local Authority Support

  • One City Climate Strategy
  • Bristol Green Capital
  • Sustainable Schools Network
  • Community Energy Fund

Bristol School Success Stories

Real results from schools across Bath, Weston-super-Mare, Clevedon, Portishead, Yate, Thornbury

Bristol, BSIndependent

Clifton College

£31,500
Annual Savings
130kWp
System Size
"The solar installation perfectly complements our commitment to environmental leadership."
Bristol, BSSecondary

Redland Green School

£23,400
Annual Savings
95kWp
System Size
"Our students are conducting award-winning research using the real-time solar data."
Bristol, BSPrimary

St George Primary

£16,200
Annual Savings
55kWp
System Size
"The children check the solar generation first thing every morning - they're so engaged!"

Bristol Areas We Serve

Comprehensive coverage across all Bristol districts with local installation teams

Bath

Full coverage area

Weston-super-Mare

Full coverage area

Clevedon

Full coverage area

Portishead

Full coverage area

Yate

Full coverage area

Thornbury

Full coverage area

Transport & Installation Access

Major Route Coverage

  • • M4 motorway
  • • M5 corridor
  • • M32 city link
  • • Bristol Temple Meads

Local Landmarks

  • • Near Clifton Suspension Bridge
  • • Near Bristol Cathedral
  • • Near SS Great Britain
  • • Near University of Bristol

Frequently Asked Questions - Bristol

How much does solar panel installation cost for schools in Bristol?

Solar installation costs in Bristol typically range from £40,000-£150,000 depending on school size. However, with Great British Energy funding and Salix Finance options, many schools pay nothing upfront and see immediate savings on their energy bills.

What areas in Bristol do you cover?

We serve all schools across Bristol including Bath, Weston-super-Mare, Clevedon and surrounding areas. Our installation teams are strategically located to provide rapid response times throughout South West England.

How quickly can you install solar panels at our Bristol school?

We guarantee holiday-only installation to avoid disrupting education. Most Bristol school installations are completed in 3-5 days during Easter or summer holidays. We're currently booking for Easter 2025.

Ready to Transform Your Bristol School's Energy Future?

Join 34+ schools across Bristol already saving money and educating the next generation