Can a Condition Improvement Fund bid pay for school solar panels?
Updated 7 October 2026 · SEO Dons Editorial
For every other route, see our guide to solar panels for schools grants.
The only national bidding route left
With the Public Sector Decarbonisation Scheme closed and no Salix loan for English schools, the Condition Improvement Fund is the one national fund a school can still bid into. That has made it the subject of a lot of hopeful advice about solar. The Department for Education’s information for applicants for 2026 to 2027 is more specific than most of that advice.
Who can bid
To bid for 2026 to 2027, a school had to be one of these at the start of September 2025:
- a stand-alone academy;
- a school in a multi-academy trust with fewer than five schools or fewer than 3,000 pupils;
- a voluntary aided school in a VA body or group under the same thresholds — VA schools contribute at least 10% of the cost;
- a sixth-form college.
Larger trusts and local authorities with maintained schools receive School Condition Allocation instead and cannot bid. The 2026 to 2027 round closed at noon on 16 December 2025, and outcomes were announced on 22 May 2026.
What CIF pays for
CIF is a condition fund. The guidance gives the highest priority to projects addressing compliance and health and safety, and to critical replacements of coal and oil-fired boilers with low-carbon heating alternatives where there is a risk of school closure. It then prioritises weather-tightness and continuous heating and water supply.
Why solar-only bids fail
The guidance is direct: works to improve energy efficiency, such as lighting projects, which do not involve works to address high-need condition issues “are unlikely to be successful in receiving CIF funding as they have a lower priority”. A solar array on a sound roof is exactly that kind of project. Where solar does appear in the guidance, it is as an example of evidence of positive environmental impact for the sustainability part of the score — alongside rainwater recycling, smart lighting and heat pumps.
How to design solar into a condition bid
- Start from the condition need. A roof at the end of its life is the most common one. The bid is the roof; the solar is designed in.
- Use the sustainability requirement. The guidance expects applicants to consider energy-efficient and environmentally sustainable options when replacing components, and to evidence any reduction in energy use with data — so use your own metered consumption, not a generic estimate.
- Keep the costs separable. Price the roof and the solar separately, so that if the bid succeeds on the roof alone, the solar can still go ahead from capital or a power purchase agreement.
- Get VAT right. Academies exclude VAT from project costs unless advice says it is payable; sixth-form colleges and VA schools include it, leaving out only any element they can reclaim.
If CIF will not fund it
Most solar on English schools will be funded from capital or a power purchase agreement, not CIF. Our school solar cost guide shows what a school array costs and earns, and our page on Salix funding for schools explains why the loan many guides still mention is not available in England.
Frequently asked questions
Can the Condition Improvement Fund pay for solar panels?
Rarely on their own. CIF funds condition work, and its guidance says energy-efficiency works that do not address high-need condition issues are unlikely to be successful. Solar is best designed into a bid built on a genuine roof or heating need.
Who can bid for CIF?
Stand-alone academies, schools in trusts with fewer than five schools or fewer than 3,000 pupils, qualifying voluntary aided schools and sixth-form colleges. Larger trusts and local authorities receive School Condition Allocation instead.
When is the next CIF round?
The 2026 to 2027 round closed on 16 December 2025 and outcomes were announced on 22 May 2026. Check the DfE’s CIF guidance on gov.uk for the next round’s dates.
Get a no-obligation quote for solar panels for your school
Responds within one working day
- 1. Tell us about your school — roof, location and, if you have it, your half-hourly meter data.
- 2. We introduce you to an installer that covers your area, who surveys the site and quotes in writing.
- 3. You decide — there is no obligation to go ahead.
Check any installer on these registers before you sign:
- MCS Certified
- NICEIC
- RECC
- TrustMark