solarpanelsforschools

School solar check: your estimate and funding routes

Answer five quick questions about how your school is funded, add where to send it, and you get the funding routes that fit your school and nation, a desk estimate built from published sources and a printable governor summary. We reply by email.

School solar check: funding routes first

Your funding routes and solar evidence, straight away

  • 1. Five quick questions — your nation, who funds your school’s building works, how you would pay, your type of school and roof, and when governors decide.
  • 2. Where to send it — school name, email and postcode; everything else is optional.
  • 3. Your result on the next page — the funding routes that fit a school like yours, a desk estimate of size, generation, value and payback from published sources, and a printable governor summary.
Step 1: about your school
Step 2: where to send it

By submitting you agree to our privacy policy. Your result appears on the next page. Your enquiry comes to us by email and we reply by email.

This is a desk check from published figures: no installer, site visit or reply time is promised.

What the school solar check does

The check turns a few facts about your school into a first-pass picture of solar for your site: the likely size of an array, how much electricity it would generate in a year, what that is worth to you, a simple payback, and the funding routes open to a school of your type in your nation. It runs in your browser from published inputs, and the result appears on the page after you submit. It is a desk estimate: it does not replace a survey, a structural opinion or a quote.

What we ask, and why

FieldWhy we ask
NationSet from your postcode, and you can change it. It decides the funding routes, the planning rules, the grid rules and the yield.
Who funds your school’s building worksMaintained, academy, trust size, VA, independent and so on, with options for each nation. In England it decides CIF against School Condition Allocation and the VAT position; in Scotland and Wales whether the council’s Salix route applies.
How your school would payGrant or public loan, power purchase agreement, lease or finance, your own capital, or not sure. The result leads with the route you chose and tells you honestly if it does not fit.
Type of school and roof ageType sets the typical size assumption; roof age tells you whether the roof, not the solar, is the first project.
When governors decide (optional)So the result can flag the CIF 2027–28 deadline of 12 noon on 15 December 2026 where it applies.
School name, email and postcodeWhere we reply, and the postcode sets the yield zone. Your name, phone and yearly kWh are optional; kWh lets the estimate compare generation with your use.

What your estimate is built on

Every number comes from a stated source or a stated assumption. Nothing is a quote, and nothing is copied from an installer’s brochure.

InputValue usedSource
Installed cost£1,262 per kWDepartment for Energy Security and Net Zero, Solar PV cost data 2025/26, median for 10–50 kW installations including VAT where applicable. DESNZ publishes no band above 50 kW, so larger arrays use the same figure as a cautious assumption.
Electricity value24.14p per kWh for power used on siteDESNZ Quarterly Energy Prices, non-domestic average including the Climate Change Levy, Q1 2026.
Yearly generationPer kW of array, by postcode zone (for example 875 kWh per kW in Birmingham for a 10° south-facing array)PVGIS v5.3 (European Commission), 14% system losses.
Ageing0.5% a yearMedian degradation in Jordan and Kurtz (2013), “Photovoltaic degradation rates: an analytical review”.
Export income5p per kWhOur assumption. Smart Export Guarantee rates are set by each licensee and must be above zero, so check yours.
Typical size and on-site share30–80 kW for a primary up to 100–500 kW for an independent school; 55–85% used on siteThe assumptions published on our school solar cost guide. No official typical-size benchmark exists, so these are ours and are stated, not hidden.

The payback is the installed cost divided by the first year’s saving plus export income. It ignores finance charges, maintenance, inverter replacement and any change in electricity prices, so treat it as a comparison between options, not a forecast.

What the estimate is not

  • Not a quote. Nobody is pricing your roof. Real quotes depend on structure, electrical work and grid connection; the school roof checklist lists what to settle first.
  • Not an offer of an installer, a survey or a visit. We are an independent publisher. We do not install, survey or arrange visits.
  • Not proof that you are eligible for funding. It names the routes that apply to a school of your type and nation, and links to the rules. Condition Improvement Fund and School Condition Allocation eligibility is notified by the Department for Education each autumn and “should not be assumed unless it has been confirmed”.

The funding routes it points to

Funding for school solar is narrower than most guides suggest, and it differs by nation. In England the Public Sector Decarbonisation Scheme has closed to new applications, there is no Salix loan, and Great British Energy selects the schools it funds. The routes that remain are your own capital, devolved formula capital, a condition-led bid to the Condition Improvement Fund where the solar rides on genuine roof work, or a commercial power purchase agreement. Scotland and Wales have their own public-sector loan schemes. Northern Ireland is devolved too.

What happens after you submit

  1. You see your estimate. The next page shows the desk estimate and the funding routes for your school type and nation. It is computed in your browser from the inputs above.
  2. Your enquiry reaches us by email. The form posts to our enquiry inbox.
  3. We reply by email. We do not promise a reply time, an installer introduction or a site visit, and we do not pass your details to an installer. If that ever changes we will say so on this page before you submit anything.

We use your details only to reply to your enquiry. Our privacy policy sets out what we hold and your rights.

Who runs this site

solarpanelsforschools.co.uk is an independent guide to solar PV for UK schools, academies and multi-academy trusts, published by SEO Dons Ltd (Company No. 16766013), 71–75 Shelton Street, Covent Garden, London WC2H 9JQ. We are not an installer, we are not part of Great British Energy and we are not a government body. We explain costs, funding and rules from primary sources, name those sources, and date what we check. The about page says more about how the site works.

Before you sign with anyone

  • Check any installer on the MCS installer register, and confirm any NICEIC, RECC or TrustMark membership they claim on those bodies’ own sites.
  • Ask for evidence in writing that every operative who will be on site has had the checks the school requires under Keeping Children Safe in Education.
  • Settle roof age, asbestos survey status, structure and any RAAC before comparing quotes.
  • Ask for a quote that shows the yearly generation, the share used on site and the export assumption, so that you can compare like with like. Our guide to how much solar panels cost for a school shows what those should look like.

Frequently asked questions

Is the school solar check really free?

Yes. There is nothing to pay for the check or the estimate. You give a postcode and an email address, see the estimate on the next page, and we reply by email.

Will an installer contact me?

No. We do not pass your details to an installer, we do not arrange site visits and we do not promise a reply time. We reply by email.

How accurate is the estimate?

It is a desk estimate from published inputs: the DESNZ median cost for 10–50 kW systems, the DESNZ non-domestic electricity price, PVGIS yield for your postcode zone, a 0.5% a year ageing assumption and a stated 5p export assumption. It will be close enough to compare options, and it is no substitute for a survey and a written quote.

Which funding routes does the check show?

The routes that apply to a school of your type and nation, for example devolved formula capital, a Condition Improvement Fund bid where the school is eligible, a power purchase agreement, and the devolved-nation schemes in Scotland and Wales. In England there is no Salix loan and the Public Sector Decarbonisation Scheme is closed.

What do you do with my details?

We use them only to reply to your enquiry. The privacy policy explains what we hold and your rights.

Check my school